B Jxj Series for Dynamic Applications Gearbox

B Jxj Series for CZPT Applications CZPT

CZPTshine CZPT Cycloid Geared Motor Traits

one. Characteristics:
1. Smooth working,reduced sound equipment tooth needle a lot more engagement.
2. Cycloidal tooth profile gives a substantial get in touch with ratio to face up to overload shocks
3. Compact measurement: one ratio CZPT from 1/9 to one/87, double stage up from 1/ninety nine to 1/7569 
4. Ideal for dynamic purposes: repeated begin-quit-reversing duties fits for cyclo speed reducer given that inertia is low
5. Lessen servicing fees: higher trustworthiness, lengthy lifestyle, minimum servicing compared to traditional gearboxes
six. Inside parts replaceable with other makes to make certain working.

7. Grease Lubricated & Oil Lubricated Types Accessible
eight. Output Shaft Rotation Course: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Problems: Indoor Installation:10-40 Celsius, Max eighty five% Humidity, Underneath 1000m Altitude, Effectively Ventilated Surroundings, Free of charge of corrosive,        explosive gases, vapors and dust
ten.Slow Speed Shaft Path: Horizontal, Vertical Up & Down, CZPT Route
11.Mounting Type: Foot Mount, Flange Mount & Vertical F-flange Mount,
12. Enter Relationship: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
14. Cycloid reducer Capacity Assortment: .37kW ~ 11kW

2. CZPT parameters

Sort Outdated Type Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned army mould organization, was recognized in 1965. CZPTshine specializes in the total electricity transmission answer for high-stop equipment manufacturing industries primarily based on the purpose of “System Product, Application Style and Professional Provider”.
CZPTshine have a robust technical power with in excess of 350 staff at current, such as in excess of thirty engineering technicians, 30 good quality inspectors, masking an spot of 80000 square meters and sorts of CZPTd processing devices and screening equipments. We have a excellent foundation for the business software development and service of large-end speed reducers & variators proudly owning to the provincial engineering technologies investigation center,the lab of gear speed reducers, and the foundation of modern R&D.

Our Team

Quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

seven. Certification.

Packing

Delivery

 

B Jxj Series for CZPT Applications CZPT

Tags: gearbox