Cycloidal Gearbox with Vertical F-Flange Mount

Cycloidal CZPT with Vertical F-Flange Mount

CZPTshine CZPT Cycloid Geared Motor Characteristics

one. Characteristics:
one. Smooth working,low sounds gear tooth needle a lot more engagement.
2. Cycloidal tooth profile provides a high get in touch with ratio to withstand overload shocks
three. Compact dimensions: solitary ratio CZPT from one/9 to 1/87, double phase up from 1/99 to 1/7569 
four. Best for dynamic apps: regular start-stop-reversing obligations satisfies for cyclo speed reducer since inertia is low
five. Decrease routine maintenance expenses: higher trustworthiness, extended lifestyle, minimal routine maintenance in comparison to traditional gearboxes
6. Interior components replaceable with other manufacturers to make sure running.

7. Grease Lubricated & Oil Lubricated Versions Available
8. Output Shaft Rotation Path: Single Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Conditions: Indoor Installation:ten-40 Celsius, Max eighty five% Humidity, Beneath 1000m Altitude, Effectively Ventilated Environment, Cost-free of corrosive,        explosive gases, vapors and dust
10.Sluggish Speed Shaft Direction: Horizontal, Vertical Up & Down, CZPT Route
11.Mounting Type: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Enter Link: Cyclo Integral Motor, Hollow Enter Shaft Adapter
13. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Ability Range: .37kW ~ 11kW

two. CZPT parameters

Type Aged Sort Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned army mould enterprise, was recognized in 1965. CZPTshine specializes in the comprehensive electrical power transmission remedy for high-end tools producing industries primarily based on the goal of “Platform Item, Software Design and style and Skilled Support”.
CZPTshine have a powerful complex pressure with above 350 staff at current, like above thirty engineering technicians, 30 quality inspectors, covering an spot of 80000 sq. meters and sorts of CZPTd processing machines and testing equipments. We have a great basis for the business application advancement and support of substantial-conclude pace reducers & variators owning to the provincial engineering engineering research centre,the lab of gear speed reducers, and the base of modern day R&D.

Our Group

High quality Manage
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

 

Cycloidal CZPT with Vertical F-Flange Mount