F collection Parallel Shaft-CZPTcal Geared Motor Attributes
one.Characteristics:
- High effectiveness: ninety two%-94%
- Parallel output, compact construction, huge output torque, clean operation, low noise and prolonged service life.
- High precision: the equipment is created of higher-good quality alloy metal forging, carbonitriding and hardening remedy, grinding procedure to guarantee substantial precision and steady working.
- High interchangeability: extremely modular, serial design and style, powerful versatility and interchangeability.
two. CZPT parameters
Ratio | three.seventy seven-276.77 |
Input power | .twelve-200KW |
Output torque | 3.5-21700N.m |
Output speed | 5-352rpm |
Mounting sort | Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Strategy | Flange enter(AM), shaft input(Advert), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-manual launch(lock in the brake launch position), HR-manual release(autom-atic braking situation) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Placement | M1, M2, M3, M4, M5, M6 |
Sort | F37-F157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing materials | HT200 large-toughness forged iron from R37,47,57,sixty seven,77,87 |
Housing materials | HT250 Substantial strength forged iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening remedy |
Efficiency | 92%-ninety four% |
Lubricant | VG220 |
Protection Course | IP55, F class |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould company, was established in 1965. CZPTshine specializes in the comprehensive power transmission remedy for higher-finish products manufacturing industries based on the purpose of “Platform Solution, Application Layout and Specialist Service”.
CZPTshine have a powerful technical power with above 350 staff at existing, including in excess of 30 engineering technicians, 30 high quality inspectors, masking an region of 80000 square meters and varieties of CZPTd processing devices and tests equipments. We have a excellent basis for the market application advancement and support of substantial-stop pace reducers & variators possessing to the provincial engineering engineering research centre,the lab of equipment velocity reducers, and the foundation of contemporary R&D.
Our Group
High quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
seven. Certification.
All our merchandise get ISO & CE & UL certification.
Packing
Delivery