F Series Parallel Shaft Helical Gearbox with Different Ratio

F Series Parallel Shaft Helical CZPT with CZPT Ratio

F sequence Parallel Shaft-CZPTcal Geared Motor Traits

1.Features:

  1. Higher efficiency: ninety two%-ninety four%
  2. Parallel output, compact structure, huge output torque, easy procedure, low noise and long provider daily life.
  3. Higher precision: the gear is manufactured of high-high quality alloy steel forging, carbonitriding and hardening treatment method, grinding procedure to guarantee high precision and secure working.
  4. Large interchangeability: highly modular, serial design, robust flexibility and interchangeability.

2. CZPT parameters

Ratio three.77-276.77
Input power .twelve-200KW
Output torque three.5-21700N.m
Output speed five-352rpm
Mounting variety Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Enter Approach Flange enter(AM), shaft enter(Advertisement), inline AC motor enter, or AQA servo motor
Brake Launch HF-handbook launch(lock in the brake release place), HR-handbook release(autom-atic braking place)
Thermistor TF(Thermistor safety PTC thermisto)
TH(Thermistor safety Bimetal swotch)
Mounting Place M1, M2, M3, M4, M5, M6
Sort F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing materials HT200 large-energy forged iron from R37,47,57,sixty seven,seventy seven,87
Housing substance HT250 Higher toughness cast iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening remedy
Effectiveness ninety two%-ninety four%
Lubricant VG220
Security Class IP55, F class

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould business, was proven in 1965. CZPTshine specializes in the complete electrical power transmission solution for large-conclude tools production industries primarily based on the goal of “Platform Merchandise, Application Design and Professional Provider”.
CZPTshine have a robust specialized power with in excess of 350 workers at current, like in excess of 30 engineering specialists, thirty good quality inspectors, masking an area of 80000 sq. meters and kinds of CZPTd processing devices and screening equipments. We have a good foundation for the business application improvement and service of large-finish velocity reducers & variators owning to the provincial engineering technological innovation analysis heart,the lab of equipment speed reducers, and the foundation of modern R&D.

Our Staff

Top quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

7. Certification.
All our goods get ISO & CE & UL certification.

Packing

Shipping

F Series Parallel Shaft Helical CZPT with CZPT Ratio