High Efficiency Cycloid Pin Wheel Gearbox

High Efficiency Cycloid Pin Wheel CZPT

CZPTshine CZPT Cycloid Geared Motor Traits

one. Functions:
1. Smooth working,lower sounds gear tooth needle much more engagement.
2. Cycloidal tooth profile offers a large get in touch with ratio to endure overload shocks
3. Compact dimension: one ratio CZPT from 1/9 to one/87, double stage up from 1/ninety nine to 1/7569 
4. Ideal for dynamic applications: recurrent begin-quit-reversing responsibilities suits for cyclo pace reducer since inertia is lower
five. Decrease servicing expenses: high reliability, long lifestyle, minimum servicing compared to typical gearboxes
6. Interior components replaceable with other manufacturers to ensure operating.

seven. Grease Lubricated & Oil Lubricated Designs Obtainable
8. Output Shaft Rotation Course: Solitary Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Conditions: Indoor Installation:ten-40 Celsius, Max eighty five% Humidity, Under 1000m Altitude, Properly Ventilated Surroundings, Free of charge of corrosive,        explosive gases, vapors and dust
10.Gradual Speed Shaft Path: Horizontal, Vertical Up & Down, CZPT Route
eleven.Mounting Type: Foot Mount, Flange Mount & Vertical F-flange Mount,
12. Input Link: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Ability Range: .37kW ~ 11kW

two. CZPT parameters

Variety Aged Variety Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould organization, was set up in 1965. CZPTshine specializes in the complete power transmission answer for large-stop equipment manufacturing industries based on the intention of “Platform Solution, Application Style and Skilled Support”.
CZPTshine have a robust specialized force with above 350 employees at present, which includes above 30 engineering specialists, thirty top quality inspectors, masking an area of 80000 sq. meters and varieties of CZPTd processing equipment and tests equipments. We have a great basis for the market application improvement and service of large-conclude pace reducers & variators proudly owning to the provincial engineering engineering study center,the lab of equipment pace reducers, and the foundation of contemporary R&D.

Our Staff

Good quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping and delivery

 

High Efficiency Cycloid Pin Wheel CZPT

Tags: gearbox