Nmrv063 Series Worm Gear Box

Nmrv063 Series Worm Gear Box

RV series Attributes

  • RV – Measurements:030-040-050-063-075-a hundred and five-110-one hundred thirty-one hundred fifty
  • Input Alternatives: with enter shaft, With Square flange,With Enter Flange
  • Enter Electrical power .06 to 11 kW
  • RV-Size from 030 to 105 in die-cast aluminium alloy budy and more than 110 in solid iron
  • Ratios in between 5 and 100
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium units are supplied complete with artificial oil and allow for universal mounting positions, with no need to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimension 030 and above are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, lower/high temperature oil, filling/drain/breather/level plug,Little hole

Basic versions can be utilized to a broad range of electrical power reduction ratios from five to one thousand.
Warranty: One year from date of delivery.

 

WORM GEARBOX          
SNW SERIES          Output Speed Range:
Kind Outdated Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Energy:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould business, was recognized in 1965. CZPTshine specializes in the full electricity transmission answer for high-finish gear manufacturing industries primarily based on the intention of “System Item, Software Layout and Expert Support”.
CZPTshine have a robust specialized power with in excess of 350 staff at current, like in excess of 30 engineering experts, 30 good quality inspectors, covering an area of 80000 sq. meters and sorts of CZPTd processing devices and testing equipments. We have a good basis for the sector application growth and provider of substantial-stop speed reducers & variators possessing to the provincial engineering technological innovation investigation centre,the lab of gear pace reducers, and the foundation of modern R&D.

Our Staff

Quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Delivery

 

Nmrv063 Series Worm Gear Box